The following text was translated by Google Translate.
Residential building in EPP on base parcel No. 383 with basement including boiler room, cellars, technical and parking.Overlooking the lake, this residence blends harmoniously with its contemporary and traditional architecture. It consists of 20 spacious apartments of 2.5 rooms to 5.5 rooms, bright with their large windows, all decorated with either a garden or a balcony with comfortable dimensions.
Basement composed of: 20 cellars - 1 local electricity - 1 laundry - 1 local concierge - 18 indoor parking spaces (including 3 reduced mobility), 6 boxes and 7 outdoor parking spaces (in addition to visitor places also at the entrance 'outside)
The elevator as well as the entrance doors have an opening of 90cm, a large airlock with secure entry and videophone for each apartment, external lighting for access at night.
This building benefits from state-of-the-art construction techniques, thus reducing energy costs to their minimum requirements, notably thanks to efficient peripheral insulation, a pellet boiler, rooftop photovoltaic panels and triple-glazing.
The construction to the EPP standards, increased sound standards, meters for hot water heating, domestic hot water, cold water connected to the technical room with a BUS line.
The load-bearing walls, the separating walls between the apartments, the peripheral walls are made of concrete with peripheral insulation for the external walls, the interior sound walls on Knauf chassis, floor heating with 1 thermostat per room, triple glazing on PVC chassis, controlled ventilation mono-stream.
An outdoor bike location and large gardens on the ground floor complete this construction.
Living areas are the sharp surfaces between walls
Sales areas are PPE surfaces, walls without added insulation of 1/2 of the balcony surfaces and 1/3 of the terrace surfaces.
Price of parking places:
Inner box: CHF 30'000.-
Inside parking place: CHF 20'000.-
Outdoor seating: CHF 10'000.-
Parks and garages
Storage box : 6
Indoor parking : 18
Outside parking spaces : 7
Additional data
Date of availability : immediately
Year built : 2020
Completed construction : 2021